Bay Area Rails

Photo Gallery


Home Upload file Login
Album list Last uploads Last comments Most viewed Top rated My Favorites Search
Home > Key Route System
stepdetail
# 575 on the F line stored between runs at tower #2. Platform detail. Note valve next to ventilator, IFA signal is run by an arm drops and trips this valve throwing train into emergency. Has to be manually reset. J.G.Graham Collection Courtesy of the Oa

stepdetail

# 575 on the F line stored between runs at tower #2. Platform detail. Note valve next to ventilator, IFA signal is run by an arm drops and trips this valve throwing train into emergency. Has to be manually reset. J.G.Graham Collection Courtesy of the Oa


Comment 1 to 3 of 3
Page: 1

Stash   [Jan 04, 2005 at 06:07 AM]
Those tripper arms, when installed on the new articulated units, controlled the pantograph. Trip board moved arm which released pantograph when leaving third rail territory. Rake off blocks raised the third rail shoes.

Comment 1 to 3 of 3
Page: 1

Add your comment 
Name Comment